I can't wait for the bathroom to look like a real bathroom instead of bare studs. We made some good headway the past few days.
First, we got the backer board up so we weren't staring at the studs. Mitch also got that outlet into place.
We put down most of the rest of the floor tile. There are still a few areas that need to be tiled, but its almost done.
The area around the tub is going to present some problems. Stupid curved tub.
Getting the baseboard on:
I totally love the baseboard we picked.
Getting subway tiles up
And the new view from the toilet :)
Next step: grout, and then sink installation
No comments:
Post a Comment