Friday, March 4, 2011

We haven't stopped working on the house!

So we've been gone from the blog for awhile, mostly because we haven't had many days off together.  Mitch was gone for a couple weeks in mid February, then I was gone for a bit earlier this week. So we've been doing tiny bits here and there, but nothing too dramatic to photograph.  But we have made some headway and have bigger headway planned this month, so here are some updates.

First, the living room is pretty much done.  We still need frames on the windows as you'll see, the curtains need hemming, and we need to finish putting on the baseboards.  But for most part, we're done.

Mid painting, Atlas decided to walk on my freshly painted surfaces.

The crime:

White paw prints on my nice hardwood floor:

Irrefutable evidence!  Someone is in trouble!


Once I got past that and repainted the damn built ins, we got to putting baseboards on.  Well not the true baseboards I guess, but the quarter round at the base.

Pre:


Post:


Mitch also put an overhead light in the living room, which had none.



Now, some before and after living room photos.  Before:


After:





Now on to the bathroom, which I have also been working on. 

We picked out a sweet shower curtain.  Its nice to not have an old curtain tacked up to the plaster.  :)

I also did some work on the built ins.  Here are before and after photos. 

Before:


After:

We've taken the wall down to the studs, and after some replumbing/rewiring, we're going to get the wall up and start tiling again. 


And our next project, which we'll do along with the bathroom, is the master bedroom.  We cleaned it all out, and its ready for some demo. 


So thats what we've been doing.  Hopefully we will be better this month about getting work done and getting stuff posted. 

No comments:

Post a Comment